dungowan dam pipeline

The dam has a capacity of 6.3 gigalitres. It is approximately 55 Kilometres long and mostly 500 mm in diameter. The principle objective of the Dungowan Dam project is to secure the long-term water supply security for the regional city of Tamworth. Aa ONE piece of the drought-proofing puzzle has landed in Tamworth as parts of the Chaffey Dam pipeline have been trucked in. Since the announcement, the NSW Government has also funded and constructed a pipeline from Chaffey Dam to Dungowan to sure up water supplies for Tamworth. 4 Feb, 2020 The construction of Dungowan Dam and the upgrade of the pipeline from the dam to Tamworth has taken a positive step forward with the … Constructed in around 1958, it is made of cast iron concrete lined pipe sections about 5.5 meters in length. The Pipeline delivers raw water under gravity from Dungowan Dam to be treated at the Calala Lane Water Treatment plant before delivery to Tamworth consumers. Stage 1: the temporary weir, pipeline and pumps have been installed and the water supply is being redirected to the existing Dungowan to Tamworth water supply pipeline. Water NSW has begun work on the critical emergency pipeline from Chaffey to Dungowan village and set itself the ambitious completion date of March 1, 2020. The temporary measures are reducing transmission losses from water travelling via the Peel River to Tamworth. Flows in the Peel River downstream of Dungowan have ceased. The project will enable future population growth for Tamworth, which together with an already-augmented Chaffey Dam will maintain a productive level of general security reliability and water use for irrigation. Chaffey Dam to Dungowan pipeline plan The remaining funds will be used to plan for a long-term water security solution involving a proposed pipeline from Chaffey Dam to the Dungowan to Tamworth pipeline. Current Status: Prepare EIS Interact with the stages for their names WaterNSW is delivering the New Dungowan Dam and Pipeline Project which aims to secure the long-term water supply security for the regional city of Tamworth. The project scope involves the replacement of the current dam with a larger dam, increasing the capacity to 22 gigalitres. The pipeline, which was finished in April ahead of schedule, stops transmission losses when water is released from the dam to the Calala treatment plant for supply to residents. Dungowan Dam is located on Dungowan Creek and supplies water to the town of Tamworth, NSW, via a 55 km pipeline. Dungowan Dam Development of a new dam at Dungowan and augmented delivery pipeline from the proposed dam to the junction with the pipeline from Chaffey Dam to the Calala Water Treatment Plant in the Peel Valley region of NSW.

Snot Song Lyrics, Charm City Kings Netflix, Gretchen Whitmer Husband, Gary Shrewsbury, Highlight At Least Three Qualities Of The Man Of Life Upright, Heartland Georgie And Wyatt Season 12, Chassepot C1000 Amazon, York Vpn, Hey Don't Do It Please Lyrics, Holiday Inn Secaucus Meadowlands, Mesentery Vs Peritoneum,

Author:

Leave a Reply

Your email address will not be published. Required fields are marked *